Fall/Winter 2018

Well we have been in the building a year now. We’ve made a lot of progress in that year. We acquired and additional 1200 sq ft of building space taking us up to 7200 sq. ft in our facility. We have also added employees bringing my total in the shop up to 4 full time people. The biggest victory of the year was the addition of our large gas oven. This oven is 22′ long, and 8′ x 8′ inside. This opens up our capacity for larger parts like car frames, race car chassis, larger railings etc. It has also increased our flow capacity so we’re able to move jobs through the shop at a much faster pace. We are very excited to be considered on of Iowa’s premier powder coating facilities. Stop in sometime and check us out.

Leave a Reply

Your email address will not be published. Required fields are marked *